Ronzoni S.r.l.

Ronzoni srl has been operating in the field of public works and road construction for over 70 years, becoming a point of reference in the provinces of Monza Brianza, Milan, Varese and throughout Lombardy. Today our activity in the field of infrastructure and road services extends throughout Italy.

Turn to us for:

Infrastructures

Road paving
Plumbing and Sewerage works
Demolition and Earthmoving
Bridges and Viaducts
Public Green

Road Services

Road Maintenance
emergency services
Road services
Clearing services
Construction material sales
Construction waste management
Mechanical interventions

Contacts

Ronzoni S.r.l.

icon_widget_image Legal and operational headquarter: Via Cacciatori delle Alpi, 97, 20822 Seveso (MB) icon_widget_image Operational headquarter: Via Guglielmo Marconi 18, 20811 Cesano Maderno (MB) icon_widget_image Mon-Fri: 8:00am - 5:30pm; Sat: 8:00am - 12:00pm icon_widget_image + (39) 0362540030 icon_widget_image info@impresaronzoni.it C.F. e P.IVA 03078140963

Follow us:

BURAGO | VIMERCATE

East (A51) and North (A52) Bypass maintenance

Planned resurfacing of the floors at night

East (A51) and North (A52) Bypass maintenance

Routine maintenance of the pavements on the East (A51) and North (A52) ring roads in Milan and equipment under the responsibility of Milano Serravalle – Milano Tangenziali S.p.A.

The works concerned the planned resurfacing of asphalt pavements in areas belonging to the Milano Serravalle – Milano Tangenziali s.p, on motorway roads, interchanges and connecting sections, on station aprons and service areas.

The work was awarded through a call for tenders awarded in ATI with Favini Costruzioni S.r.l. and Ronzoni Srl (Head of Group).

Activities of our competence:

– milling of bituminous conglomerates for different thicknesses and sections, with or without lateral obstacles;
– Supply and installation by special machinery of bituminous conglomerate, for different and different layers (base layer, binder and wear), thicknesses and sections.

The works were carried out at night (from 22:00 to 6:00) in order to reduce traffic disruptions.
The precise and punctual planning and coordination of site activities, from construction to the implementation of temporary signs have allowed us to comply with the schedules established by the client.

Project Info

Category:
Date: